NIAB 1 (DARWIN GREEN 1): S/0247/14/DC
This application is for discharge of planning conditions relating to S/0001/07/F for Darwin Green 1, which approved the formation of vehicular, pedestrian and cycleway access road from Histon Road to serve the urban extension of the city between Huntingdon Road and Histon Road, Cambridge, together with drainage and landscaping Works.
The conditions this application relates to include:
- Condition 3 - Hard and Soft Landscape Works
- Condition 5 - Landscape Maintenance and Management Plan
- Condition 7 - Scheme for the Provision and Implementation of Pollution Control of the Water Environment
- Condition 8 - Ecological Management Plan
- Condition 9 - Construction Management Plan
- Condition 12 - Levels of Road and Associated Structures
- Condition 13 - Soil and Contamination
- Condition 14 - Archaeology
- Condition 17 - Detailed Waste Management Plan
Condition 6 - Detailed Surface Water Drainage is a separate application ref. S/0204/14/DC.
The documents relating to the above details can be accessed here. Please ask us if you require these documents on CD-ROM.
Condition 3 - Hard and Soft Landscape Works
628.2-108 Rev D Attenuated Landscape Sheet 01 (of 02) A0
628.2-109 Rev E Attenuated Landscape Sheet 02 (of 02) A0
628.2-208 Rev C Attenuated Landscape PP Sheet 01 (of 02) A0
628.2-208 Rev C Attenuated Landscape PP Sheet 01 (of 02) A0
628.2-209 Rev D Attenuated Landscape PP Sheet 02 (of 02) A0
628.2-209 Rev D Attenuated Landscape PP Sheet 02 (of 02) A0
628.2-300-Rev F Typical Landscape Details
Design Code Compliance Statement 140115
Condition 5 - Landscape Maintenance and Management Plan
628.2 RPT03 - Rev C - Landscape Management and Maintenance Plan (SCDC) binder
Condition 7 - Scheme for the Provision and Implementation of Pollution Control of the Water Environment
B11005IDB - Condition 7 Pollution Control November 2013 [PDF, 61Kb]
Condition 8 - Ecological Management Plan
AEL0635_SCDC Ecological MP V3 0 20131023
Condition 9 - Construction Management Plan
DG SCDC Construction management plan December 2013
Appendix A Vehicle routes for major deliveries [PDF, 0.1MB]
Appendix B Traffic management plan TMP01 [PDF, 0.4MB]
Appendix C Examples of site specific safety board [PDF, 0.7MB]
Appendix D Drive in Drive out Wheel wash [PDF, 0.7MB]
Appendix E Construction Sign Pack [PDF, 1.5MB]
Appendix F Standard Site Compound [PDF, 1.5MB]
Appendix G The control of dust and emissions [PDF, 0.5MB]
Appendix H Risk assessment for mortar silos [PDF, 1MB]
Appendix I Light Pollution [PDF, 2.5MB]
Appendix J Health and Safety in construction [PDF, 0.1MB]
Appendix K Protecting The Public [PDF, 1.5MB]
Appendix L CC Code of Practice [PDF, 35Kb]
Appendix M Guidance for Mobile Crushing and Screening [PDF, 0.7MB]
Appendix N Detailed waste management plan [PDF, 2MB]
Condition 12 - Levels of Road and Associated Structures
B11129IDB-Condition 12 Road levels November 2013 [PDF, 5MB]
Condition 13 - Soil and Contamination
Main Site Investigation_Part 1
Main Site Investigation_Part 2
Main Site Investigation_Part 3
Main Site Investigation_Part 4
Main Site Investigation_Part 5
25459-02R(00) Supplementary Investigation
25459-R03 (00) Summary Geo Environmental Report
Condition 14 - Archaeology
Archaeology Albion PD 2012-57 version 1.3 [PDF, 1.5MB]
Condition 17 - Detailed Waste Management Plan
Appendix N - Detailed waste management plan [PDF, 2MB]